Our services

Cr(VI) research, decontamination, substitution and disposal

Four connected services that take a site from an unknown risk to a proven, documented result. Most engagements start with research and analysis, then move through the remaining services as the evidence directs.

How we work

A disciplined sequence that keeps exposure, downtime and cost under control at every stage.

  1. Research and sample

    We survey the plant, take on-site samples and breathing-air measurements, and confirm chromium (VI) in accredited laboratories.

  2. Assess and plan

    Results are turned into a clear picture of where Cr(VI) is, at what levels, and exactly what the COSHH duty requires.

  3. Decontaminate

    Contaminated surfaces and components are cleaned under controlled conditions, coordinated closely with your site team.

  4. Substitute

    Chromate-forming insulation is replaced with alkaline-free materials, so the hazard cannot return.

  5. Dispose and document

    Hazardous waste is removed to the correct codes, with the documentation that evidences your duty of care.

Start with an assessment

Tell us about the plant and we will recommend where to begin.

Request a site assessment